Appendix E
CHECK
SHEET FOR ASSESSING AN INTERVENTION PLAN
(To be completed by the steering committee)
RATING KEY: 1 = needs more attention or isn't clear: 2 = seems OK: 3 = plans well in place.
Area |
Comments |
Rating |
1. Clarity of overall goals for intervention. |
|
|
2. Identification of target system and its members. |
|
|
3. Organogram and analysis of power in
the system. |
|
|
4. Clarity of timetable, financial, personnel and other resources. |
|
|
5. Description of credibility-building plans. |
|
|
6. Experience with previous interactions considered. |
|
|
7. Description of strategy (directing, persuading, problem-solving). |
|
|
8. Role of intervener—amount of control expected. |
|
|
9. Force field analysis of factors related to plan. |
|
|
10. Proposals made to reduce restraining forces. |
|
|
11. Description of norms the intervention is expected to change. |
|
|
12. Description of method for gaining acceptance of plans. |
|
|
13. Procedures for involving those affected by the change. |
|
|
14. Methods proposed for gaming acceptance of plans. |
|
|
15. Clarification of leverage points intervention will use. |
|
|
16. Data collection on needs (tools and collection methods). |
|
|
17. Assessment of present group functioning. |
|
|
18. Data analysis procedures (methods and by whom). |
|
|
19. Who sets goals using what procedures? |
|
|
20. Acceptance-gaining procedures for action plans. |
|
|
21. Consideration of impact of change on related systems. |
|
|
22. Training of participants in use of planned change methods. |
|
|
23. Follow-up and action-stabilizing plans. |
|
|
24. Description of next round or closure procedures. |
|
|
25. Disengagement of consultant/intervenor. |
|
|
26. Evaluation design (tools and collection methods). |
|
|
27. Report back and replanning procedures. |
|
|
28. Reports or other documentation of intervention. |
|
|
29. Overall intervention closure. |
|
|
...The Author